Lidl Tuam | SMET Bauprotec Render System | McCallion Group

 

Job: LIDL Tuam
Contractor/Smet Supported Partner: McCallion Group
SMET Products Used:

Bauprotec 850 M – Lime Cement Render

Bauprotec RHS – Multi-Purpose Render

Related Downloads

Description

Local Smet Supported Partner, a seasoned Lidl Contractor, McCallion Group machine applied the LIDL External Render System onto Poroton blocks externally using as Base Coat: Bauprotec 850 M – Lightweight Lime Cement Render, and as Key Coat: Change of substrate concrete/steel pillar/Poroton block or mass concrete and insulated plinths: Bauprotec RHS Multi-Purpose Render.

The internal Render System specification onto Poroton blockwork consists of a base of Coat: Bauprotec 850 M, Lightweight Lime Cement Render, sponge floated in warehouse areas, and skim finished in sales areas. Key Coat: Change of substrate concrete/steel pillar/Poroton block: Bauprotec RHS is used.

The Irish LIDL render spec, available from SMET consists of:

Bauprotec 850 M is a factory-produced Lightweight Lime Cement Render, specially designed for machine or hand application produced to EN 998-1: 2010 and is CE Marked.

Bauprotec RHS is a CE Marked, factory-produced highly polymer-modified render specially designed for hand and machine application produced to EN 998-1: 2010.

The special render properties; lightweight, low thermal conductivity, high yield, and the Smet Supported Partner superior technical backup, are key factors in choosing SMET.

SMET is committed to delivering consistently superior quality, German-made Render Systems to Lidl Plastering and rendering/plastering contractors across the UK and ROI.  If you’d like to speak to us about your Lidl job – contact SMET.

All LIDL spec SMET Render System products are available directly from Smet Building Products Ltd, which ensures the contractor has a superior level of technical backup in the machine application of the LIDL specification.

Lidl Sligo | SMET Bauprotec Render System | McCallion Group

 

Job: LIDL Sligo
Contractor/Smet Supported Partner: McCallion Group
SMET Products Used:

Bauprotec 850 M – Lime Cement Render

Bauprotec RHS – Multi-Purpose Render

Related Downloads

Description

Local Smet Supported Partner, a seasoned Lidl Contractor, McCallion Group machine applied the LIDL External Render System onto Poroton blocks externally using as Base Coat: Bauprotec 850 M – Lightweight Lime Cement Render, and as Key Coat: Change of substrate concrete/steel pillar/Poroton block or mass concrete and insulated plinths: Bauprotec RHS Multi-Purpose Render.

The internal Render System specification onto Poroton blockwork consists of a base of Coat: Bauprotec 850 M, Lightweight Lime Cement Render, sponge floated in warehouse areas and skim finished in sales areas. Key Coat: Change of substrate concrete/steel pillar/Poroton block: Bauprotec RHS is used.

The Irish LIDL render spec, available from SMET consists of:

Bauprotec 850 M is a factory produced Lightweight Lime Cement Render, specially designed for machine or hand application produced to EN 998-1: 2010 and is CE Marked.

Bauprotec RHS is a CE Marked, factory produced highly polymer-modified render specially designed for hand and machine application produced to EN 998-1: 2010.

The special render properties; lightweight, low thermal conductivity, high yield, and the Smet Supported Partner superior technical backup, are key factors in choosing SMET.

SMET is committed to delivering consistently superior quality, German-made Render Systems to Lidl Plastering and rendering/plastering contractors across the UK and ROI.  If you’d like to speak to us about your Lidl job – contact SMET.

All LIDL spec SMET Render System products are available directly from Smet Building Products Ltd, who ensures the contractor has a superior level of technical back up in the machine application of the LIDL specification.

SMET is committed to delivering consistently superior quality, German-made Render Systems to Lidl Plastering and rendering/plastering contractors across the UK and ROI.  If you’d like to speak to us about your Lidl job – contact SMET.

 

Lidl Lurgan | SMET Bauprotec Render spec | McCallion Group

Job: LIDL Lurgan
Main Contractor: McCaliion Group
SMET Products Used: Bauprotec 850 M – Lime Cement Render

Bauprotec RHS – Multi-Purpose Render

Related Downloads

Description

Local Smet Supported Partner, McCallion Group, machine applied the LIDL External Render System onto Poroton blocks externally using as Base Coat: Bauprotec 850 M – Lightweight Lime Cement Render, and as Key Coat: Change of substrate concrete/steel pillar/Poroton block or mass concrete and insulated plinths: Bauprotec RHS Multi-Purpose Render.

The internal Render System specification onto Poroton blockwork consists of a base of Coat: Bauprotec 850 M, Lightweight Lime Cement Render, sponge floated in warehouse areas and skim finished in sales areas. Key Coat: Change of substrate concrete/steel pillar/Poroton block: Bauprotec RHS is used.

The Irish LIDL render spec, available from SMET consists of:

Bauprotec 850 M is a factory produced Lightweight Lime Cement Render, specially designed for machine or hand application produced to EN 998-1: 2010 and is CE Marked.

Bauprotec RHS is a CE Marked, factory produced highly polymer-modified render specially designed for hand and machine application produced to EN 998-1: 2010.

 

The special render properties; lightweight, low thermal conductivity, high yield and Smet Supported Partner superior technical backup, are key factors in choosing SMET.

Here’s the McCallion Group in action:

Mc Callion Group – Recent Lidl Projects from Mc Callion Group on Vimeo.

SMET is committed to delivering consistently superior quality, German-made Render Systems to Lidl Plastering and rendering/plastering contractors across the UK and ROI.  If you’d like to speak to us about your Lidl job – contact SMET on.

All LIDL spec SMET Render System products are available directly from Smet Building Products Ltd, who ensures the contractor has a superior level of technical back up in the machine application of the LIDL specification.

Lidl Portmarnock | SMET Bauprotec Render spec | McCallion Group

Job: LIDL Portmarnock, Ireland
Main Contractor: McCaliion Group
SMET Products Used: Bauprotec 850 M – Lime Cement Render

Bauprotec RHS – Multi-Purpose Render

Related Downloads

Description

Smet Supported Partner, Mc Callion Group, machine applied the LIDL External Render System onto Poroton blocks externally using as Base Coat: Bauprotec 850 M – Lightweight Lime Cement Render, and as Key Coat: Change of substrate concrete/steel pillar/Poroton block or mass concrete and insulated plinths: Bauprotec RHS Multi-Purpose Render.

The internal Render System specification onto Poroton blockwork consists of a base of Coat: Bauprotec 850 M, Lightweight Lime Cement Render, sponge floated in warehouse areas and skim finished in sales areas. Key Coat: Change of substrate concrete/steel pillar/Poroton block: Bauprotec RHS is used.  Here’s the McCallion Group in action:

 

The LIDL render spec, available from SMET consists of:

Bauprotec 850 M is a factory produced Lightweight Lime Cement Render, specially designed for machine or hand application produced to EN 998-1: 2010 and is CE Marked.

Bauprotec RHS is a CE Marked, factory produced highly polymer-modified render specially designed for hand and machine application produced to EN 998-1: 2010.

Mineral Finish Coat – K is a CE marked, factory produced mineral based, high-quality finish-coat render, specially designed for hand and machine application to EN 998-1, 2010.

Bauprotec SLP is a CE Marked, factory produced Lightweight Sand & Cement Render specially designed for hand and machine application produced to EN 998-1: 2010.

The special render properties; lightweight, low thermal conductivity, high yield and Smet Supported Partner superior technical backup, are key factors in choosing SMET.

SMET is committed to delivering consistently superior quality, German-made Render Systems to Lidl Plastering and rendering/plastering contractors across the UK and ROI.  If you’d like to speak to us about your Lidl job – contact SMET on.

All LIDL spec SMET Render System products are available directly from Smet Building Products Ltd, who ensures the contractor has a superior level of technical back up in the machine application of the LIDL specification.

Lidl Swords | SMET Bauprotec Render spec | McCallion Group

Job: New Lidl Store, Swords, Co Dublin
Smet Supported Partner: McCallion Group
SMET Products Used:

Bauprotec 850 M – Lime Cement Render

 Bauprotec RHS – Multi Purpose Render

Related Downloads

Description

Bauprotec 850 M – Lightweight Lime Cement Render and CASEA Bauprotec RHS – Multi Purpose Render, were selected for the LIDL spec render facade of the brand new Lidl Store located in Virginia Co Cavan.  Smet Supported Partner, McCallion Construction Group, applied the Lightweight CE marked Lime Cement Render, produced to EN 998-1: 2010, internally and to external facade.  Bauprotec 850 M is manufactured from a controlled blend of selected aggregates, lightweight aggregates, cement, polymers, fibres and other components to give a high-quality weather resistant rendering product which is suitable for use in external rendering and internal plastering. The product’s special composition allows the product to breathe and also permits constant hygrometric exchange between the substrate and the environment. Bauprotec RHS is a CE Marked, factory produced highly polymer-modified render specially designed for hand and machine application produced to EN 998-1: 2010.

The special render properties; light weight, low thermal conductivity, high yield and Smet Supported Partner superior technical backup, are key factors in choosing SMET German-made render products in delivering consistently high-quality render systems to Lidl Plastering and Rendering Contractors.

Here’s the McCallion Group in action:

McCallion said, ‘This was a brand-new concept for Lidl and it was the first of its kind to be built in Ireland. The project was meticulously programmed by McCallion Group so that it could be fully completed in just 25 weeks. The project was completed one week ahead of programme for the client. The works consisted of the demolition of four large houses, outbuildings, sheds, walls and the removal of 10,000m3 of inert soil from the site. When the demolition works was completed, McCallion Group commenced the construction of a three tier Lidl Undercroft retail store. The ground floor housed a carpark, control rooms, a goods and customer elevator, three stairwells, a double carriage travellator and an entrance lobby. From the entrance lobby, customers can travel to the first floor by a choice of a travellator, elevator or stairwells. The main shop floor is located on the first floor along with a bakery, freezers, a warehouse and welfare facilities for both the staff and customers. Further plant rooms are located on the second floor. The external works included all groundworks, pipework and utility installation, kerbing, tarmacking, line-marking and fencing. The store opened in October 2016 and it is now a flagship store for Lidl Ireland. The store boasts of a new, higher specification that Lidl Ireland has introduced for all stores going forward’. For more on other McCallion delivered McCallion Lidl Render System projects.

The special render properties; lightweight, low thermal conductivity, high yield and Smet Supported Partner superior technical backup, are key factors in choosing SMET.

SMET is committed to delivering consistently superior quality, German-made Render Systems to Lidl Plastering and rendering/plastering contractors across the UK and ROI.  If you’d like to speak to us about your Lidl job – contact SMET on.

All LIDL spec SMET Render System products are available directly from Smet Building Products Ltd, who ensures the contractor has a superior level of technical back up in the machine application of the LIDL specification.

Lidl Virginia Co Cavan | SMET Bauprotec Render spec | McCallion Group

Job: New Lidl Store, Virginia, Co Cavan
Smet Supported Partner: McCallion Group
SMET Products Used:

Bauprotec 850 M – Lime Cement Render

 Bauprotec RHS – Multi Purpose Render

Related Downloads

Description

Bauprotec 850 M – Lightweight Lime Cement Render and CASEA Bauprotec RHS – Multi Purpose Render, were selected for the LIDL spec render facade of the brand new Lidl Store located in Virginia Co Cavan.  Smet Supported Partner, McCallion Construction Group, applied the Lightweight CE marked Lime Cement Render, produced to EN 998-1: 2010, internally and to external facade.  Bauprotec 850 M is manufactured from a controlled blend of selected aggregates, lightweight aggregates, cement, polymers, fibres and other components to give a high-quality weather resistant rendering product which is suitable for use in external rendering and internal plastering. The product’s special composition allows the product to breathe and also permits constant hygrometric exchange between the substrate and the environment. Bauprotec RHS is a CE Marked, factory produced highly polymer-modified render specially designed for hand and machine application produced to EN 998-1: 2010.

The special render properties; light weight, low thermal conductivity, high yield and Smet Supported Partner superior technical backup, are key factors in choosing SMET’s German-made render products in delivering consistently high-quality render systems to Lidl Plastering and Rendering Contractors.

All LIDL spec SMET Render System products are available from Smet Building Products Ltd, who ensure the contractor has superior technical back up in the application of the specification.

SMET is committed to delivering European innovations across the UK and ROI.

For more on other McCallion delivered McCallion Lidl Render System projects.

New Lidl Store Armagh

Job: New Lidl Store, Armagh, Co Armagh
Client: McCallion Construction
Products:

CASEA Bauprotec 850 M – Lime Cement Render

CASEA Bauprotec RHS – Multi Purpose Render

Related Downloads

Description

Bauprotec 850 M Lightweight Lime Cement Render and CASEA Bauprotec RHS – Multi Purpose Render, was selected for the the render facade of the brand new Lidl Store located in the busy Co Armagh town of Armagh.  Smet Supported Partner, McCallion Construction Group, applied the Lightweight CE marked Lime Cement Render, produced to EN 998-1: 2003, internally and to external facade.  Bauprotec 850 M is manufactured from a controlled blend of selected aggregates, lightweight aggregates, cement, polymers, fibres and other components to give a high-quality weather resistant rendering product which is suitable for use in external rendering and internal plastering. The product’s special composition allows the product to breathe and also permits constant hygrometric exchange between the substrate and the environment.

The special render properties; light weight, low thermal conductivity, high yield and Smet Supported Partner superior technical backup, were the key factors in choosing Smet Building Products in delivering high-quality product to MCCallion Construction.

For more info on our range of click SMET Render Systems.

 

Lidl Banbridge, Co Down | SMET Bauprotec Render spec | McCallion Group

Job: New Lidl Store, Banbridge, Co Down
Client: McCallion Construction
Product: Bauprotec 850 M – Lime Cement Render

Related Downloads

Description

Bauprotec 850 M Lightweight Lime Cement Render was selected for the render facade of the brand new Lidl Store located in the busy Co Down town of Banbridge.  Smet Supported Partner, McCallion Construction Group, applied the Lightweight CE marked Lime Cement Render, produced to EN 998-1: 2003, internally and to external facade.  Bauprotec 850 M is manufactured from a controlled blend of selected aggregates, lightweight aggregates, cement, polymers, fibres and other components to give a high-quality weather resistant rendering product which is suitable for use in external rendering and internal plastering. The product’s special composition allows the product to breathe and also permits constant hygrometric exchange between the substrate and the environment.

The special render properties; light weight, low thermal conductivity, high yield and Smet Supported Partner superior technical backup, were the key factors in choosing Smet Building Products in delivering a high-quality product to McCallion Construction.

For more info on our range of click SMET Render Systems.

 

Lidl Store Refurbishment, Buncrana, Co Donegal

Job: Lidl Store Refurbishment, Buncrana, Co Donegal
Client: McCallion Construction
Product:  Bauprotec 850 M – Lime Cement Render

Related Downloads

Description

Bauprotec 850 M Render was selected for the refurbishment, of the existing Lidl store located in the picturesque town of Buncrana, Co Donegal.  Smet Supported Partner, McCallion Construction, from Buncrana spray applied the Lightweight CE marked Lime Cement Render, produced to EN 998-1: 2003, internally and externally.  Bauprotec 850 M is manufactured from a controlled blend of selected aggregates, lightweight aggregates, cement, polymers, fibres and other components to give a high quality weather resistant rendering product which is suitable for use in external rendering and internal plastering. The product’s special composition allows the product to breathe and also permits constant hygrometric exchange between the substrate and the environment.  The special render properties; light weight, low thermal conductivity, high yield and Smet Supported Partner superior technical back up, were the key factors in choosing Smet Building Products as the provider in delivering CASEA’s high quality product.