Job: | Rapid Drying Floor Renovation, Co. Waterford |
Client: |
Brendan Doherty Screeding Services |
Product: | Sopro Rapidur® B5 Rapid Drying Screed Binder |
Related Downloads
Description |
|
Floor renovated with fast-track – rapid drying floor screed solution, allowing early flooring installation. SMET supplied Sopro Rapidur® B5 Rapid Drying Screed Binder to Smet Supported Partner, Brendan Doherty Screeding Services, for the flooring renovation of 650m2 over UFH. German made Rapidur® B5 Rapid Drying Screed Binder, is a special polymer-modified binder for particularly economical production of high-strength, rapid-set cement screed – based on DIN 18560 – allowing early floor installation. Rapidur® B5 is suitable for use on heated screeds, bonded screeds, unbonded screeds and floating screeds. This flooring solution is particularly useful for fast-track or tightly scheduled screed laying. The newly laid Rapidur® B5 screed floor is ready to receive floor covering after approx. 3 days – after achievement of moisture content ≤ 1.8 % CM. Sopro Rapidur® B5 is supplied in 25kg bags, 40 bags per pallet. SMET delivers another innovative, showcase flooring solution to their Smet Supported Partners. |
Job: | Lockbrickland Orange Hall, Co Down |
Smet Supported Partner: |
Brendan Doherty Screeding Services |
Product: | Sopro Rapidur® B5 Rapid Drying Screed Binder |
Related Downloads
Description |
|
Local orange hall opts for Fast-Track floor screed solution, allowing early flooring installation. SMET supplied Sopro Rapidur® B5 Rapid Drying Screed Binder to Smet Supported Partner, Brendan Doherty Screeding Services, for the 300m2 flooring solution in the historical building of Lockbrickland Orange Hall, situated in the picturesque village of Lockbrickland near Banbridge. German made Rapidur® B5 Rapid Drying Screed Binder, is a special polymer-modified binder for particularly economical production of high-strength, rapid-set cement screed – based on DIN 18560 – allowing early floor installation. Rapidur® B5 is suitable for use on heated screeds, bonded screeds, unbonded screeds and floating screeds. This flooring solution is particularly useful for fast-track or tightly scheduled screed laying. The newly laid B5 screed floor is ready to receive floor covering after approx. 3 days – after achievement of moisture content ≤ 1.8 % CM. The hall was finished with a natural wood floor. Rapidur® B5 is supplied in 25kg bags, 40 bags per pallet. SMET delivers another innovative, showcase flooring solution to their Smet Supported Partners. |
Job: | Tallaght Fire Station |
Smet Supported Partner: |
B Doherty Screeding Services |
Main Contractor: | MOM Services Ltd |
Related DownloadsDescription |
|
SMET supplied Sopro Repadur 50 Concrete Repair Mortar to Smet Supported Partner, Brendan Doherty, for the floor repair solution at Tallaght Fire Station. With a tight turnaround in this busy working environment, where heavy vehicles and general wear and tear degraded the existing flooring, German made Sopro Repadur 50 Concrete Repair Mortar was an ideal solution for floor restoration; creating an industrial grade, perfectly smooth, sag-resistant working surface. Sopro Repadur 50 is a cementitious, fibre-reinforced concrete substitute for reprofiling and large-area coating of concrete substrates in accordance with ZTV-ING regulations and DafStb repair guidelines. This flooring solution is particularly useful for renovation and repair of commercial and industrial concrete floors. SMET delivers, once again, an innovative, Professional Flooring Solution to its Smet Supported Partners. |
Job: | Balconies, Heuston Square, Dublin |
Smet Supported PArtner: | Brendan Doherty Screeding Services |
Main Contractor: | JJ Rhatigan Ltd |
Related Downloads
SMET Floor Screeds and Compounds Product Selector
TDS SBR Bond
Description
In order to create falls on balconies constructed from precast concrete. Brendan Doherty Ltd applied a highly polymer modified screed ranging from depths of 5mm up to 45mm after application of a bonding slurry over 800 m². The product was pumped using a pneumatic floor screed pump up to 6 stories high. A showcase project of innovative best practice.