The Sidings Grand Canal Dock | Final Pour | Rapidur EB5 for Rapid Drying Screed

B Doherty Mobile Screed Factory_at the Boston Sidings Final Pour_EB5 Rapid Drying Floor Screed

Job: Boston Sidings Grand Canal Dock Final Pour
Smet Supported Partners:
Main Contractor:
B Doherty Screeding Service

Collen Construction

Product: Rapidur® EB5 Rapid Drying Floor Screed

Description

We supplied our Rapidur® EB5 additive to Smet Supported Partner, B Doherty Screeding Mobile Screed Factory. On behalf of Collen Construction, using their Mobile Screed Factory, with the help of Laser-Guided, Screed Robot, they supplied polymer-modified Rapidur® EB5 Rapid Drying Sand / Cement screed with fibres at 75mm.  This ensured a fast turnaround with UFH being commissioned 3 days later at the Grand Canal Dock Boston Sidings. Have a look at these wonderful pictures.

• Factory Produced On-Site
• Rapid Drying and Fibre Reinforced
• Allowing early use of screed
• Allowing early floor covering installations
• Bonded, Unbonded, and Floating Floor Screed Constructions
• Suitable For Underlayment In Wet Areas
• BS 8204-1 ISCR Categories A, B, and C

 SMET assists in delivering another innovative, showcase flooring solution to their Smet Supported Partners.